You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Meruya Indah Dinormalisasi
.
photo TP Moan Simanjuntak - Beritajakarta.id

Meruya Indah Connecting Channel Normalized

West Jakarta Sub-dept. of Water Management dredges connecting channel at Meruya Indah, Jalan Meruya Selatan. The project is aimed to add the channel volume during rainy season.

The sediment has reached one meter

“The sediment has reached one meter,” said Imron Syahrin, head of agency, Thursday (8/11).

According to him, Jalan Meruya Selatan will be inundated during heavy rain. The water level could reach 30 cm.

Pondok Gading Connecting Channel Dredged

“The channel width is five meter. We dredge along 200 meter. The water should flow normally to Labrata connecting channel at Meruya Utara,” he added.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye716 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye603 personFolmer
  3. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye287 personBudhi Firmansyah Surapati
  4. Transjakarta Ready to Support People's Mobility This Eid

    access_time30-03-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye246 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik